Construction Projects

2024 Construction Projects

Sewer Rehabilitation Project

This winter and early spring Bloomfield Township will be undertaking a program to rehabilitate the public sanitary sewer system. Many of the sanitary sewers located within Foxhill’s and Kirkwood subdivisions will be rehabilitated utilizing a Cured in Place Piping (CIPP) system. This method greatly reduces the disturbance and associated restoration as it avoids the need to excavate the sewers to perform the repairs.
 

Project Contacts

Should you have a concern or question about the project, please notify the Project Engineer, Bloomfield Township Engineering and Environmental Services Department, or DVM Utilities, as listed herein:
 
Bloomfield Township                     Hubbell, Roth & Clark ( HRC )         DVM Utilities
Paul Palace                                   Chris Ross, P.E.                              Karl Bates III
4200 Telegraph road                     555 Hulet Drive                                Project Manager
Bloomfield Hills, MI 48303             Bloomfield Hills, MI 48302            
248-594-2809                                248-330-7344                                  586-979-0402
ppalace@bloomfieldtwp.org      cross@hrcengr.com                      Kbates@dvmutilities.com
 
 


 

Lakewood Water Main Replacement

The water system that serves the residents on Lakewood Road was installed in the late 1950's and consists of 8-inch cast iron water mains. The Township operates and maintains the water system for the benefit of the Bloomfield Township residents. As part of the Township's continuing capital improvement program, existing water mains along Lakewood Road are being replaced. The scope of work includes replacing the aging 8-inch diameter water mains as well as replacing and adding hydrants and valves. The contractor for this project is D' Angelo Brothers, Inc. The work is anticipated to start in the Spring or Summer of 2024.
 

Project Contacts

Should you have a concern or question about the project, please notify the Project Engineer, Bloomfield Township Engineering and Environmental Services Department, or D' Angelo Brothers, Inc., as listed herein:

Bloomfield Township                     Hubbell, Roth & Clark ( HRC )         D’Angelo Brothers, Inc.
Paul Palace                                  Chris Ross, P.E.                                Vince D’Angelo
4200 Telegraph road                     555 Hulet Drive                                30836 W. 8 Mile Rd
Bloomfield Hills, MI 48303            Bloomfield Hills, MI 48302                Farmington Hills, MI 48336
248-594-2809                               248-330-7344                                   248-525-1942
ppalace@bloomfieldtwp.org     cross@hrcengr.com                       vince@dangelo-brothers.com

 
   

Club Drive Sanitary Sewer Replacement

Late spring and early summer Bloomfield Township will be repairing a sanitary sewer on Club Drive road. The repair will consist of installing a new pier-supported 16” Ductile iron sanitary sewer and a new manhole structure. The length of the sewer repair is 177 feet. The repair will create a full road closure of Club Drive during the utility construction of the sanitary sewer project. Construction signage will be placed for the closure and the detour. Emergency vehicle and local driveway access for the closed section of Club Drive will be maintained throughout construction via a temporary gravel access road on the south side of the road. The project will be going out to bid in April 2024.
 

Project Contacts

Should you have a concern or question about the project, please notify the Project Engineer, or Bloomfield Township Engineering and Environmental Services Department.

Bloomfield Township                     Hubbell, Roth & Clark ( HRC )
Paul Palace                                   Chris Ross, P.E.
4200 Telegraph road                     555 Hulet Drive
Bloomfield Hills, MI 48303            Bloomfield Hills, MI 48302
248-594-2809                               248-330-7344
ppalace@bloomfieldtwp.org     cross@hrcengr.com 


South Bloomfield Highlands Water Main Installation

Assessment District (SAD) majority approved by the South Bloomfield Highlands Residents, the existing water main distribution system in the South Bloomfield Highlands Subdivision is being replaced. The scope of work includes replacing the existing well system with an 8-inch diameter water main, replacing hydrants and gate valves, and abandoning the existing water main and well system. The new system will be tied over to the existing municipal water supply, which will eliminate the need for replacement and long-term maintenance of the existing well system.  The project is currently under design with bidding anticipated later in 2024.